insulating ceramic paint and insulating paint additivesSpace Age Ceramic
Insulating Paint for
Homes, Industry, Roofs
And Transportation
Selected by NASA as   "NASA Spinoff Technology Products for 2003"insulating paints and paint additives insulate,reduce energy costs,save money and improve comfort
insulating ceramic house paint

Insulating Roof Paint
Metal Roof Application-pg 2

STEP#: 6 ( If Applicable)
CLEAR COAT SKYLIGHTS

Be sure skylight surface is clean and free of all moisture. Apply using brush, roller or spray. Spread PERMACLEAR liberally over the skylights at a rate of 200-225 square feet per gallon per coat. Feather in excess puddles and runs before coating is dry. Wait at least 4 hours before applying a second coat of PERMACLEAR at a rate of 225-250 square feet per gallon.
STEP#:7 PRIME COAT
Apply PRIMER (BOND-IT) using 1- brush, 2- at least a one inch nap roller, or 3- at least a 1 gallon per minute, 3,000 P.S.I. piston type airless sprayer with a minimum tip size of .019 tip.
When Spraying or Rolling BOND IT, it must be applied perpendicular to the slope of the roof; example: If the slope of the roof runs from North to South then the coating will be applied from East to West. This will be the start of a checkerboard application pattern.
Apply the BOND IT at a rate of 200-250 square feet per gallon covering the entire roof surface. Let BOND IT dry at least 12 hours before continuing.
met-13.jpg (39851 bytes)

met-14.jpg (28393 bytes)

STEP#: 8 FIRST COAT of FINISH/TOP COAT
Be sure entire surface is clean and free of all moisture. Be sure the entire area to be coated is primed, if not, then spot prime as needed.
Apply HY-TECH Roof Coating using 1- brush, 2- at least a one inch nap roller, or 3- at least a 1 gallon per minute, 3,000 P.S.I. piston type airless sprayer with a minimum tip size of .027 tip, ( note larger size tip is needed ). Remove tip and gun filters before starting.
When Spraying or Rolling HY-TECH Roof Coating, the first coat must be applied perpendicular to the coat of BOND IT Primer to achieve a checkerboard pattern.
Apply the first coat of HY-TECH Roof Coating at a rate of 100-125 square feet per gallon per coat over the entire roof surface. Wet film thickness of 12-15 mils resulting in dry film thickness of 8-10 mils. Let dry at least 12 hours before continuing.
 

met-15.jpg (30025 bytes)

met-16.jpg (48115 bytes)

STEP#: 9 SECOND COAT of FINISH/TOP COAT
Be sure entire surface is clean and free of all moisture. Be sure the entire roof area is completely coated, if not, then spot coat.
Apply HY-TECH Roof Coating using 1- brush, 2- at least a one inch nap roller, or 3- at least a 1 gallon per minute, 3,000 P.S.I. piston type airless sprayer with a minimum tip size of .027 tip. Remove tip and gun filters before starting.
When Spraying or Rolling HY-TECH Roof Coating, the second coat of HY-TECH Roof Coating must be applied perpendicular to the first coat of HY-TECH Roof Coating completing the checkerboard pattern.
met-19.jpg (26534 bytes)

met-23.jpg (31146 bytes)

Apply the second coat of HY-TECH Roof Coating at a rate of 100-125 square feet per gallon per coat over the entire roof surface. Wet film thickness of 12-15 mils resulting in dry film thickness of 8-10 mils. Let dry at least 24 hours before your Final Evaluation.  

met-25.jpg (44525 bytes)

met-26.jpg (24288 bytes)

STEP#: 10 FINAL EVALUATION
At this time a detailed evaluation of the completed job will determine the quality of the workmanship and whether strict application specifications have been met. The entire roof surface must be completely coated & sealed. Be sure to check that all roof areas are completely coated and sealed under permanently placed roof items such as roof top air conditioning units.
Divide roof into 1,000 square feet sections and randomly check one spot in each section for a dry film thickness of at least 20 mils. Remember to touch up the penetration made by the dry film thickness gauge. If specifications have not been met, determine how much material will be required to meet specifications and recoat. Check dry film thickness again until specifications have been met.

Back to Page 1

How To Paint Menu:
Wood Decks, Fences and Siding, Introduction
Cleaning Wood Decks, Fences and Siding
Refinishing Wood Decks, Fences and Siding
Reduce Attic Heat with Radiant Barrier Paint
Painting Ceilings with Insulating Paint
Painting Walls and Trim
Roof Coatings Application
Insulate RV and Mobile Home with Roof Paint
Paint Siding
Paint Stucco
Use a Roller with no mess
How to spray Paint
General Painting Tips
Prices & Ordering Information |  International Buyers  |  Contact |  Questions?
Insulating Paint Additive |  Insulating Paints |  Sundries/Supplies |  HOME

Copyright © 2003,2004 All Rights Reserved.
Affiliates: Home Improvement Center Insulating House Paints Hy-Tech Insulating Paint Sales Hy-Tech Insulating additives for paint Hy-Tech ceramic additives for paint Hy-Tech insulating ceramic additives that make paint insulate Insulating Paint