![]() | Space Age Ceramic Insulating Paint for Metal Buildings and Roofs |
![]() |
How To Paint Metal Roofs
|
| STEP#:2 PRESSURE CLEANING High Pressure Blast entire roof surface with at least 1500 P.S.I. of pressure using a water and chlorine solution (approximately 1 quart chlorine to 5 gallons of water). Thoroughly remove all dirt, oil, grease, residues, mold, mildew, algae and any other surface contaminants. Severe mildew requires a stronger concentration of chlorine. When roof is completely cleaned, rinse with water only. Let roof surface dry at least 12 hours before continuing. All HY-TECH Coatings have excellent mildew resistance, but WILL NOT kill mildew already on the surface. |
![]() |
| STEP#:3 RUST TREATMENT Apply METAL-PRIME #18, (now available in white) or our new RUST REFORM #17 using brush, roller, or airless sprayer. Spot Prime all rusted areas and let dry at least 8 hours before applying the second coat of primer to the effected area(s). Consideration should be given to use two complete coats of metal primer to reduce the possibility of future rust. Apply the primer according to label instructions covering the entire rusted surface. Let final application of primer dry at least 8 hours before continuing. |
![]()
|
| STEP#:4 CAULKING SCREWS Patch and Caulk all screws or fastener heads, cracks, crevices, fractures, holes, valleys, vents, voids, etc., with ELASTO PATCH. Use a trowel or stiff brush to apply. Multiple coats are better than one thick coat if possible. The thicker ELASTO PATCH is applied the longer it will take to dry. Wait at least 4 hours before applying a second coat of ELASTO PATCH and let final application dry at least 24 hours before continuing to next step. ELASTO PATCH dries from top to bottom, so be careful when working around a caulked area since it will be skin dry. There is no problem coating over ELASTO PATCH even if it is not completely dry, since it is a high solids material. NOTE: ELASTO PATCH allows minimal shrinkage, but the thicker it is applied the more it will shrink. Check ELASTO PATCH after 24 hours to check on shrinkage. |
|
| STEP#: 5 TAPING SEAMS Tape all visible seams, large cracks and fractures prone to water intrusion on roof surface. Apply a liberal coat of BOND IT primer directly to the affected area using brush, roller or airless spray and lay the PERMATAPE directly into the WET BOND IT.Press firmly in place and smoothout wrinkles and bubbles. |
![]() |
| Tape must be put down before BOND IT has had a chance to start drying (approximately 15 minutes). | ![]() |
| After all areas are taped let dry for 1 to 2 hours.
Apply a second light coat of BOND IT over the top of the tape. Let the
taping procedure dry for at least 2 hours before continuing.
|
![]()
|
How To Paint Menu:
Wood Decks, Fences and Siding, Introduction
Cleaning Wood Decks, Fences and Siding
Refinishing Wood Decks, Fences and Siding
Reduce Attic Heat with Radiant Barrier Paint
Painting Ceilings with Insulating Paint
Painting Walls and Trim
Roof Coatings Application
Insulate RV and Mobile Home with Roof Paint
Paint Siding
Paint Stucco
Use a Roller with no mess
How to spray Paint
General Painting Tips
![]() |
Prices & Ordering Information |
International Buyers |
Contact |
Questions? Insulating Paint Additive | Insulating Paints | Sundries/Supplies | HOME |
![]() |